5D cost analysis is a common use of BIM in construction. It involves inputting item costs into the model to estimate building material expenses. Additionally, it tracks construction progress, aiding Quantity Surveyors (QS) in monitoring costs. In this blog, I'll share a method for monitoring construction foundation costs. BIM 的常見應用之一是進行 5D 成本分析,通過在模型中輸入不同項目的成本來估算建築物的材料費用。此外,它還跟蹤施工進度,幫助工程量測師( QS )監控成本。在這篇博客中,我將分享一種監控地基建設成本的方法。 Creating the Foundation Model: 創建基礎模型: Before QS payroll, prepare a dynamic foundation model. Since designs and construction limits change, ensure it's adaptable. 在進行 QS 工資支付之前,應準備好一個靈活的地基模型。由於設計和施工限制經常變化,因此確保它具有適應性。 Creating a Schedule with Unique Marks: 創建帶有獨特標記的進度表: Generate a schedule for foundation items with status markers like "Constructed" (completed), "Test" (testing), "Failure" (demolished or rejected), and "Not Constructed" (not done). 生成基礎項目的進度表,其中包含 " 已建成 " (完成)、 " 測試 " (完成測試)...