跳至主要內容

文章

顯示包含「Dynamo」標籤的文章

Automation (Dynamo & Python)

 

Model Change Analysis (Dynamo)

In a design and build project, model change monitoring is a big topic which will affect the whole construction and design life. A good monitoring of the model change  can effectively find out the potential issues of the change and trase the issues directly and immediately. In this blogger, I will like to share the method to monitor the model change of structure model whcih already successfully used in my project. Then, I will share some possible method to monitoring the model change of architecture model and MEP model and the difficulties in my project. Ready previous structure model and current model In my project, we will compare the model bi-weekly. So first I will prepare the structure model in last bi-weekly and model in current bi-weekly. Create Automation to extract the geometry data In my project, I use dynamo to extract XYZ location and size of beam, column, slab and bearing wall of both previous and current model.

Slab & Wall Modelling (Revit)

Continues to the blogger of CBWD, I would like to share more detail about the slab and wall opening modelling and the usage of this model and detail workflow. This model can large help for construction cost, mep coordination and building progress. Workflow of creating slab and wall opening model 1. Create door opening, Louvre opening and Acess opening Create architectural opening base on preliminary architectural model automatically . 2. Create MEP Opening Create MEP opening base preliminary MEP model automatically. Magical is one of the rebut addin to create MEP opening base routing and wall 3. Update opening base on CBWD needs Update the opening manually base on the comments on CBWD. This stage may need large manually works. 4. Lock the frozen opening After the CBWD is approved and available for construction, lock the related opening. This stage is to confirm the opening model match site construction . Usage of Slab and wall opening model 1. Benefits for future MEP rearrangements Whi...

Combined Builders Work Drawings Production (Revit)
合併建造工程圖(CBWD)製作(Revit)

Producing Combine Builders Work Drawings (CBWD) for opening construction is an intricate process that involves a harmonious collaboration of Architecture, Structure, and Building Services. CBWD encompasses various types of openings, such as wall openings (doors, windows, AC ducts, fire suppression pipes, etc.), slab openings (tower cranes, material hoists, AC risers, etc.), and beam openings (primarily for drain pipes). Throughout the CBWD workflow, each stakeholder plays a crucial role in ensuring that construction adheres to standards and client requirements. For example, architects specify door and window sizes, engineers assess the impact of openings on the main structure and provide calculations, and building services engineers reroute Mechanical, electrical, and plumbing ( MEP) systems to accommodate opening locations. 製作合併建造工程圖(CBWD)以進行開口建設是一個複雜的過程,需要建築、結構和建築服務的協同合作。CBWD包括各種類型的開口,如牆壁開口(門、窗戶、空調管道、消防供水管道等)、板條開口(塔吊、物料提升機、空調升降機等)和梁開口(主要用於排水管道)。在整個CBWD工作流程中,每個利益相關者都在確保建設符合標準和客戶要求方面發揮...