Facade Cast-In Embed Modelling (Revit) & AIP Drawing Production
幕墻預埋件模型及相關圖紙製作


Drawing plays a crucial role in design, approval, and construction processes. In the past, hand sketches and tools like AutoCAD were used for creating drawings. In this context, I'll share a modern method involving models and Revit, using the example of cast-in embed AIP drawings.
繪圖在設計、審批和施工過程中扮演關鍵角色。過去,人們使用手繪草圖或AutoCAD等工具來製作圖紙。在這個背景下,我將分享一種現代方法,涉及模型和Revit,以幕墻預埋件模型和製作AIP圖紙為例。

Creating a Cast-In Embed Model:
創建幕墻預埋件模型 The first step involves gathering essential information, such as detailed drawings, engineering requirements, standards, and sketches. Next, automation is key. Using a mullion model, cast-in embeds can be automatically generated with Dynamo, based on mullion locations. After the draft model is ready, it's shared with engineers through BIM Viewer for review and coordination.
第一步涉及收集關鍵資訊,如詳細圖紙、工程要求、標準和草圖。接下來,自動化是關鍵。使用窗柱模型,可以透過Dynamo自動生成與窗柱位置相關的鑄造埋入物。草稿模型準備好後,通過BIM Viewer與工程師共享,以便進行審查和協調。

Starting AIP Drawing Production:
開始AIP圖紙製作: Following drawing standards and engineer specifications, Revit is used to create layout drawings, sections, elevations, and detail drawings. Several important functions are taken into account:
遵循繪圖標準和工程規範,使用Revit創建佈局圖、剖面、立面和詳細圖紙。以下列舉幾個重要的功能:

- View Range: Managing item visibility between levels.
- View Template: Controlling visibility and appearance.
- Scale: Handling annotation presentation.
- Scope Box: Regulating layout drawing scope.
- Title Block: Formatting the drawing submission.
- Legend: Providing pattern/color indications.
- 視圖範圍:管理不同樓層之間的物件可見性。
- 視圖模板:控制可見性和外觀。
- 比例尺:處理註釋的呈現大小。
- 範圍框:規定佈局圖的範圍。
- 標題欄:標準化圖紙提交。
- 圖例:提供圖紙中的圖案/顏色指示。

Submissions and Approval Process:
提交和批准過程: Engineers send the drawings to designers and clients for approval. During this phase, I receive comments and mark-ups to rectify drawings and models. Revised drawings are attached for second review and approval.
工程師將圖紙發送給設計師和客戶進行批准。在此階段,我會收到評論和標記,以更正圖紙和模型。修訂後的圖紙會附上,供二次審查和批准。

Takeaways and Impressions:
心得和感想:
This was my first task after graduation, demanding dedicated effort and keen learning. Challenges like inefficient communication and methods led to redoing tasks. Limited professional knowledge led to frequent inquiries with engineers and seniors, resulting in constant disruptions and consuming significant time. Valuable lessons were learned:
這是我畢業後的第一個任務,需要付出充分的努力和專注學習。挑戰,如溝通效率低和方法不當,導致了重做任務。有限的專業知識導致經常向工程師和前輩提問,導致不斷打擾他們,占用他們很多時間。從中我得到了寶貴的教訓:

- Email's significance for coordination.
- Mark-ups as valuable pre-modeling info.
- Storing questions and seeking guidance from seniors once again.
- 電子郵件在協調中的重要性。
- 圖紙是建模前的很重要信息。
- 儲存問題再一次性詢問前輩。

These insights enhance my growth and effectiveness in the field. Lastly, I also hope that my experience can be of assistance to you as well.
這些見解增進了我在這個領域的成長和效能。最後,我也希望我的經驗能對您們有所幫助。


留言

此網誌的熱門文章

Combined Builders Work Drawings Production (Revit)
合併建造工程圖(CBWD)製作(Revit)

Producing Combine Builders Work Drawings (CBWD) for opening construction is an intricate process that involves a harmonious collaboration of Architecture, Structure, and Building Services. CBWD encompasses various types of openings, such as wall openings (doors, windows, AC ducts, fire suppression pipes, etc.), slab openings (tower cranes, material hoists, AC risers, etc.), and beam openings (primarily for drain pipes). Throughout the CBWD workflow, each stakeholder plays a crucial role in ensuring that construction adheres to standards and client requirements. For example, architects specify door and window sizes, engineers assess the impact of openings on the main structure and provide calculations, and building services engineers reroute Mechanical, electrical, and plumbing ( MEP) systems to accommodate opening locations. 製作合併建造工程圖(CBWD)以進行開口建設是一個複雜的過程,需要建築、結構和建築服務的協同合作。CBWD包括各種類型的開口,如牆壁開口(門、窗戶、空調管道、消防供水管道等)、板條開口(塔吊、物料提升機、空調升降機等)和梁開口(主要用於排水管道)。在整個CBWD工作流程中,每個利益相關者都在確保建設符合標準和客戶要求方面發揮...

Slab & Wall Modelling (Revit)

Continues to the blogger of CBWD, I would like to share more detail about the slab and wall opening modelling and the usage of this model and detail workflow. This model can large help for construction cost, mep coordination and building progress. Workflow of creating slab and wall opening model 1. Create door opening, Louvre opening and Acess opening Create architectural opening base on preliminary architectural model automatically . 2. Create MEP Opening Create MEP opening base preliminary MEP model automatically. Magical is one of the rebut addin to create MEP opening base routing and wall 3. Update opening base on CBWD needs Update the opening manually base on the comments on CBWD. This stage may need large manually works. 4. Lock the frozen opening After the CBWD is approved and available for construction, lock the related opening. This stage is to confirm the opening model match site construction . Usage of Slab and wall opening model 1. Benefits for future MEP rearrangements Whi...