Model Issues Tracking (BIM Track)
模型問題追蹤 (BIM Track)

In the complex world of Building Information Modeling (BIM), where engineers, designers, and clients collaborate on intricate construction and design projects, a critical challenge arises: the identification and resolution of issues. These issues encompass a wide range of concerns, including modeling discrepancies, design flaws, and crucial comments. To navigate this landscape and expedite the seamless resolution of these issues among diverse stakeholders, a robust issue tracking process is essential.
在建築信息模擬(BIM)的複雜世界中,工程師、設計師和客戶共同合作進行精密的建設和設計項目,出現了一個關鍵挑戰:問題的識別和解決。這些問題涵蓋了一系列問題,包括建模不一致性、設計缺陷和重要評論。為了在不同利益相關者之間迅速解決這些問題,需要一個強大的問題跟蹤流程來引導這個過程。

Enter BIM Track, a powerful platform designed to streamline the issue management process within the realm of BIM. BIM Track serves as the cornerstone for efficiently tracking, storing, and facilitating the approval of issues that crop up during the modeling phase. Let's delve into the workflow and explore the benefits and limitations of this indispensable tool.
這就是BIM Track的作用,它是一個旨在簡化BIM領域內的問題管理過程的強大平台。BIM Track是高效跟蹤、存儲和促進在建模階段出現的問題的核心,讓我們深入了解工作流程,探索這個不可或缺工具的優點和限制。

General Workflow using BIM Track:
使用BIM Track的一般工作流程:
1. Issue Discovery 發現問題
Our journey begins when engineers, designers, or clients embark on the critical task of reviewing BIM models using software such as Revit or Navisworks. In this meticulous process, they identify issues that warrant attention.
我們的程序始於工程師、設計師或客戶開始進行對BIM模型的詳細審查,使用軟件如Revit或Navisworks。在這個嚴謹的過程中,他們識別出需要關注的問題。
2. Thorough Documentation 詳細記錄:
These identified issues are not mere observations but are meticulously documented within BIM Track. Comments, mark-ups, and attachments provide the rich context needed to understand the intricacies of each issue.
這些識別出的問題不僅僅是觀察,而是在BIM Track內仔細記錄的。評論、標記和附件提供了理解每個問題的複雜性所需的豐富背景信息。
3. Assignment and Responsibility 分配和責任:
The next step is to assign these issues to the parties responsible for their resolution. Accountability is key to ensuring that issues are promptly addressed.
下一步是將這些問題分配給負責解決它們的各方。負責問題解決的責任是確保問題得到及時處理的關鍵。
4. Collaboration and Review 協作和審查:
The responsible parties collaborate, engage in discussions, and meticulously review the identified issues. Effective communication is pivotal during this phase.
負責問題的各方合作,參與討論,並仔細審查已識別的問題。在這個階段,有效的溝通至關重要。
5. Coordination Meeting 協調會議:
At times, a dedicated BIM coordination meeting is convened. This forum allows stakeholders to collectively tackle and resolve the identified issues, fostering a collaborative spirit.
有時,會召開專門的BIM協調會議。這個平台允許利益相關者共同解決已識別的問題,促進協作精神。
6. Model Enhancement 模型改進:
Following these discussions and deliberations, the BIM model is updated to rectify the issues at hand. Precision and accuracy are of utmost importance in this step.
在這些討論和研討之後,BIM模型會更新以糾正手頭的問題。在這一步驟中,精確性和準確性至關重要。
7. Issue Status Update 問題狀態更新
:
Once the model updates are complete and the issues resolved, they are officially marked as "solved by consultants," signifying a significant milestone in the process.
一旦模型更新完成,問題得到解決,它們會被正式標記為“由顧問解決”,這標誌著過程中的一個重要里程碑。
8. Closure and Validation 結束和驗證:
To close the issues, the inquie parties should respond with either an "Accept" or "Reject" decision, sealing the fate of each issue and ensuring its closure within the system.
為了結束這個程序,詢問方需做出“接受”或“拒絕”的決定,確保每個問題在系統內得以解決。

Benefits of BIM Track 優點:
1. Efficiency Redefined 效率:
BIM Track streamlines the labyrinthine process of issue identification, documentation, and resolution.
BIM Track簡化了問題識別、記錄和解決的繁瑣過程。
2. Structured Workflow 結構化工作流程:
It provides a structured and organized workflow for the management of BIM-related issues.
它為管理BIM相關問題提供了一個結構化和有組織的工作流程。
3. Enhanced Collaboration 增強協作:
The platform fosters seamless collaboration and communication among stakeholders.
這個平台促進了利益相關者之間的無縫協作和溝通。
4. Issue Tracking 問題跟蹤
:
BIM Track ensures that issues are meticulously tracked and officially closed, elevating project efficiency to new heights.
BIM Track確保問題得到仔細跟蹤並正式關閉,提升了項目的效率。

Limitations of BIM Track 缺點:
1. Financial Considerations 財務考慮
:
It's essential to acknowledge the potential financial hurdle of acquiring Autodesk licenses, which may be prohibitive for smaller companies.
必須認識到購買Autodesk許可證的潛在財務障礙,這對於較小的公司可能是一個限制因素。
2. Issue Quality 問題質量
:
The quality and relevance of issues documented within the platform can significantly impact the efficiency of the review and resolution process. Careful attention to issue documentation is paramount.
在平台內記錄的問題的質量和相關性可以顯著影響審查和解決過程的效率。對問題記錄的仔細關注至關重要。

In summary, BIM Track stands as a vital tool in the world of BIM, facilitating the management of issues that arise during the modeling phase. However, it's essential to strike a balance between its undeniable benefits and the considerations, such as licensing costs and the quality of issue documentation, to ensure a successful implementation within the broader context of construction and design projects.
總之,BIM Track在BIM領域中扮演著重要的角色,有助於管理在建模階段出現的問題。然而,在實施時必須在不可否認的優點和考慮因素之間保持平衡,比如許可證成本和問題記錄的質量,以確保在建築和設計項目的更廣泛背景下實現成功。

留言

此網誌的熱門文章

Combined Builders Work Drawings Production (Revit)
合併建造工程圖(CBWD)製作(Revit)

Producing Combine Builders Work Drawings (CBWD) for opening construction is an intricate process that involves a harmonious collaboration of Architecture, Structure, and Building Services. CBWD encompasses various types of openings, such as wall openings (doors, windows, AC ducts, fire suppression pipes, etc.), slab openings (tower cranes, material hoists, AC risers, etc.), and beam openings (primarily for drain pipes). Throughout the CBWD workflow, each stakeholder plays a crucial role in ensuring that construction adheres to standards and client requirements. For example, architects specify door and window sizes, engineers assess the impact of openings on the main structure and provide calculations, and building services engineers reroute Mechanical, electrical, and plumbing ( MEP) systems to accommodate opening locations. 製作合併建造工程圖(CBWD)以進行開口建設是一個複雜的過程,需要建築、結構和建築服務的協同合作。CBWD包括各種類型的開口,如牆壁開口(門、窗戶、空調管道、消防供水管道等)、板條開口(塔吊、物料提升機、空調升降機等)和梁開口(主要用於排水管道)。在整個CBWD工作流程中,每個利益相關者都在確保建設符合標準和客戶要求方面發揮...

Facade Cast-In Embed Modelling (Revit) & AIP Drawing Production
幕墻預埋件模型及相關圖紙製作

Drawing plays a crucial role in design, approval, and construction processes. In the past, hand sketches and tools like AutoCAD were used for creating drawings. In this context, I'll share a modern method involving models and Revit, using the example of cast-in embed AIP drawings. 繪圖在設計、審批和施工過程中扮演關鍵角色。過去,人們使用手繪草圖或AutoCAD等工具來製作圖紙。在這個背景下,我將分享一種現代方法,涉及模型和Revit,以幕墻預埋件模型和製作AIP圖紙為例。 Creating a Cast-In Embed Model: 創建 幕墻預埋件模型 : The first step involves gathering essential information, such as detailed drawings, engineering requirements, standards, and sketches. Next, automation is key. Using a mullion model, cast-in embeds can be automatically generated with Dynamo, based on mullion locations. After the draft model is ready, it's shared with engineers through BIM Viewer for review and coordination. 第一步涉及收集關鍵資訊,如詳細圖紙、工程要求、標準和草圖。接下來,自動化是關鍵。使用窗柱模型,可以透過Dynamo自動生成與窗柱位置相關的鑄造埋入物。草稿模型準備好後,通過BIM Viewer與工程師共享,以便進行審查和協調。 Starting AIP Drawing Production: 開始AIP圖紙製作: Following drawing standards an...

Slab & Wall Modelling (Revit)

Continues to the blogger of CBWD, I would like to share more detail about the slab and wall opening modelling and the usage of this model and detail workflow. This model can large help for construction cost, mep coordination and building progress. Workflow of creating slab and wall opening model 1. Create door opening, Louvre opening and Acess opening Create architectural opening base on preliminary architectural model automatically . 2. Create MEP Opening Create MEP opening base preliminary MEP model automatically. Magical is one of the rebut addin to create MEP opening base routing and wall 3. Update opening base on CBWD needs Update the opening manually base on the comments on CBWD. This stage may need large manually works. 4. Lock the frozen opening After the CBWD is approved and available for construction, lock the related opening. This stage is to confirm the opening model match site construction . Usage of Slab and wall opening model 1. Benefits for future MEP rearrangements Whi...